⟵ Back to News
New Project – GE Power Station
Aug 17, 2022
Rox Interiors have been appointed by CBRE Global Workplace Solutions (GWS) for a project at GE Power Station, located in Rugby.📍
Outstanding news to recieve specification by Box Architects for the full fit-out and installation of the W/C washrooms – encorporating our very own ‘Rox in a Box’! 📦♻️
The programme is scheduled to span over 15 weeks across 3 floors.
Scope of works:
– Complete W/C installation
– Drylining interior walls of W/C
– Doors + Ceiling for W/C
– Reception area + Bespoke joinery
– Sanitaryware
– Rox Interiors Cubicle systems
– Rox Interiors IPS and DDA systems